Geothermal Energy

Fields of Activity

Geothermal Energy

120 MW
Installed
Power

Our company's geothermal energy plant project, with an installed capacity of 24 Megawatts (MW), planned to be established in the "Geothermal Resources and Natural Mineral Water License Area" owned by our company in Kuyucak district, Aydın province, started in 2023.

geothermal-1.png

Our power plant, planned to be commissioned by the end of 2026, will generate energy equivalent to the installation of a 120 MW Solar Power Plant (SPP). The plant will be constructed in accordance with the highest internationally recognized environmental standards, utilizing dual-cycle technology. With its air-cooled design and zero water consumption, the facility will make a significant contribution to preserving agricultural lands in the region, safeguarding water resources for irrigation, and positively impacting the balance of the local ecosystem.

The project consists of five phases, aiming for a total installed capacity of 120 MW. The first phase, with a capacity of 24 MW, will be operational by the end of 2026, with subsequent phases being completed in 24 MW increments.

Jeotermal Enerji - Alt Liste İçerik 1

Our plant will support sustainable energy production, provide significant contributions to the green energy transition with its 100% reinjection process, and use modern technology aimed at high efficiency and low environmental impact in energy production.

It is also planned to implement a Solar Energy System (SES) investment for the internal consumption of our plant.